Hi all, "water" earthing my 16-m-mast with two 6-m-copper-rods of 1/4" diameter one came abt. one month later 30cm out of the soil agn. my question: what "syndrom" is that? Uwe/dj8wx The upper part o
Rik Strobbe schrieb: It sure is, the first time I 'watered' a rod in the soil I didn't secure it. When I returned after 5 - 10 minutes to connect the radial to it the rod was gone ... I hade to dig a
I was really amused at the 'China Syndrome' thought. That hadn't occurred to me (it's rock here), but it is a valid point, hi! It sure is, the first time I 'watered' a rod in the soil I didn't secure
Hi Rik, I was really amused at the 'China Syndrome' thought. That hadn't occurred to me (it's rock here), but it is a valid point, hi! Wouldn't zinc go pretty quickly in acid soil? quicker than coppe
I found an easy way to drive in earth rods made from copper water pipe is like this: I found a steel rod of a slightly bigger diameter than the pipe, put a point on the end, and hammered it in to the
Dear LF Group, I found an easy way to drive in earth rods made from copper water pipe is like this: I found a steel rod of a slightly bigger diameter than the pipe, put a point on the end, and hammer