Can anyone  advise on the  planning  relevance  / requirements to  these  questions  , with  regards to  Ae pole  at the  bottom of the  garden
 
1. Is the secure base moveable or is it concreted into the ground?
2. Can the mast be readily removed from the secure base?
3. If the mast is a permanent structure, has the refurbishment resulted in the erection of an entirely new mast,
 
what  is the  relevance  of the  base  being concreted into the  ground ?
 
I assume the  question  of  detaching  the  pole from the  base  is  one  of  permanent  or temporary  structure ?
 
replacing  like with  like  would  not  be classed as  a  new mast ?
 
Tnx -G
 
 